Soleil Visit
Within one of the comming months i would be at Soleil Synchrotron to finalize the designs for the Booster and Storage ring of SESAME. Alreay Soleil colleagues have helped us alot in different parts of the project. Particularly in this trip i would be discussing with Beam Diagnostics Group at Soleil different aspects of our strategy for the Diagnostics of the accelerator during commissioning and normal operation.